Skip to content

Kai Wang's RV-7 Project

Documenting My Journey of Building a RV-7

  • English

  • About This RV-7 Project
  • Blog
  • About Me
RV-7 Empennage 

06/11/2018 Horizontal Stabilizer – Front and Rear Spar Miscellaneous Items (1 Hour)

June 12, 2018June 14, 2018 admin

I drilled and primed a new elevator bearing today, carefully avoiding primer on the most inner bearings. I still ended

Read more
RV-7 Empennage 

06/10/2018 Horizontal Stabilizer – Finished Preparing the Ribs (3 Hours)

June 11, 2018June 11, 2018 admin

Basically continue on what I was working on yesterday. Now I’ve prepared HS-706, HS-707 and HS-708 ribs. HS-00005 and HS-00006

Read more
RV-7 Empennage 

06/09/2018 Horizontal Stabilizer – Ribs Fluting and Flange Faceting Removal (2 Hours)

June 10, 2018June 10, 2018 admin

This is my first time experience in fluting so it took me about an hour to finish the first rib.

Read more
RV-7 Empennage 

06/08/2018 Horizontal Stabilizer – Trimmed and Edge Deburred Ribs (2.5 Hours)

June 9, 2018June 14, 2018 admin

The aft flange on HS-00006 front rib need to be trimmed according to plan. I marked the line and used

Read more
RV-7 Empennage 

06/06/2018 Horizontal Stabilizer – Trimmed and Bent Front Spar Reinforcement Angle (3 Hours)

June 7, 2018June 7, 2018 admin
Read more
RV-7 Empennage 

06/05/2018 Horizontal Stabilizer-Drilled Relief Holes and Bent Front Spar (2 Hours)

June 6, 2018July 7, 2018 admin

I was a little nervous at the beginning of today’s session, because I haven’t practiced drilling relief hole or bending

Read more
RV-7 Empennage 

06/04/2018 Horizontal Stabilizer- Marked Bend Lines and Drill positions on Front Spar (3 Hours)

June 5, 2018June 11, 2018 admin

The front spar requires more work than the rear spar, because as Van’s points out in their instructions that the

Read more
RV-7 Empennage 

06/01/2018 Horizontal Stabilizer-Primed Elevator Hinge Bearing and First Mistake(1 hour)

June 2, 2018June 6, 2018 admin

Today I primed the hinge bearing VA-146 and a little rough area of the hinge bracket. After spraying primer on

Read more
RV-7 Empennage 

05/31/2018 Horizontal Stabilizer – Elevator Bracket and Bearing (1 Hour)

June 1, 2018July 6, 2018 admin

Match drilled all elevator brackets and bearings. The center hinge bearing was a little awkward to access once it is

Read more
RV-7 Empennage 

05/29/2018 Horizontal Stabilizer – Match Drilled Rear Spars (1.5 Hours)

May 30, 2018June 3, 2018 admin

Today I match drilled the holes to size #30 on the rear spars and reinforcement bars. After that I drilled

Read more
  • ← Previous
  • Next →

Recent Posts

  • 06/23/2019 Elevators – Trimmed Counterbalance Lead and Riveting Skin (3 hours)
  • 06/21/2019 Elevators – Finished Riveting Skeleton
  • 06/20/2019 Elevators – Riveting Skeleton (1 hours)
  • 06/19/2019 Elevators – Riveting Skeleton (1.5 hours)
  • 06/18/2019 Elevators – Dimpled Skins (1.5 hours)

Recent Comments

    Archives

    • June 2019
    • May 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018
    • July 2018
    • June 2018
    • May 2018
    • April 2018
    • March 2018
    • February 2018
    • January 2018

    Categories

    • Preparation
    • RV-7 Empennage
    • Uncategorized

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    Copyright © 2026 Kai Wang's RV-7 Project. All rights reserved.
    Theme: ColorMag by ThemeGrill. Powered by WordPress.